Passengers will board the aircraft and deplane through enclosed boarding bridges. When the new terminal opens, the apron will include parking areas for four airplanes. More parking spaces will be added and existing lots are expected to be paved in the future. It will include a restaurant, larger gate areas, boarding bridges, a more spacious concourse and a stylish, sophisticated interior. The new terminal’s 60,000 square feet of space will be almost four times the size of the old one. The new terminal will be a giant leap in size and style from the old one that mid-Missourians have become accustomed to. “Although it has 16,000 square feet, part of that space includes the three doublewide trailers that have been added to it to accommodate growth.” “The existing terminal is 51 years old,” she says. Button has been looking forward to the new terminal for years. “We are going to have a modern, accessible airport terminal,” says Stacey Button, economic development director for the city of Columbia and REDI president. The terminal is scheduled to be open for passengers in June 2022. Phase 1 will be $20 million of the total project cost, which is estimated to be approximately $35 million. In November, the Columbia City Council unanimously gave its approval for the design/build method of construction for Phase 1 of the airport’s proposed terminal. A new day and a new terminal are coming for the tens of thousands of people who fly into or out of the Columbia Regional Airport each year.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |